Case Study
Healthcare Chain - building 1 of 12
The building specifics:
- Pre 1900 solid stone construction (Grade 2 Listed)
- 35 bed residential care home
- Current annual energy bill £16,796 (Electricity £7,698 Gas £9,098)
Our onsite survey indicated the following improvement could be made to the property:
- Fit cavity wall insulation
- Gas condensing boiler
- Upgraded heating controls
- Photovoltaic panels
Potential Savings:
| Cost of improvements and upgrades | £69,969 |
| Savings + Incentives annually | £12,256 |
| Payback year | 6 |
| Return on Investment | 18% |
| Total over 25 years | £296,637.34 |